{"id":96,"date":"2020-11-18T20:56:58","date_gmt":"2020-11-18T20:56:58","guid":{"rendered":"https:\/\/wp-test-site.arcflashadvisors.com\/?page_id=96"},"modified":"2020-11-18T20:56:58","modified_gmt":"2020-11-18T20:56:58","slug":"power-quality-analysis","status":"publish","type":"page","link":"https:\/\/arcflashadvisors.com\/?page_id=96","title":{"rendered":"Power Quality Analysis"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><strong>Power Quality Analysis Services <\/strong><\/h1>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Power Quality<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>Arc Flash Advisors Ltd provides Power Quality Analysis Studies based on IEEE Std 519-1992 Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems.<br><strong>References:<\/strong><br>IEEE Std 519-1992<br>CAN\/CSA C235<br>CAN\/CSA E 1000 2-2-97<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Power Quality Study process:<\/strong><strong><\/strong><\/h2>\n\n\n\n<p><strong>Using a Fluke 434 Power Quality Analyzer Arc Flash Advisor Crews will:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Visit the facility to attach a set of power monitoring CT\u2019s and VT\u2019s &#8211; This may require de-energising the test point.<\/li><li>Provide Frontline Troubleshooting &#8211; Quickly diagnose problems and get your operations back online <img loading=\"lazy\" decoding=\"async\" src=\"\" width=\"32\" height=\"32\"><\/li><\/ul>\n\n\n\n<p><br><strong>Capture Power Quality Measures<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Magnitude &#8211; Long term level voltage<\/li><li>Unbalance &#8211; Condition of the 3 phase power system and phase angle<\/li><li>Harmonics &#8211; Peak and Total harmonic distortion<\/li><li>Flicker &#8211; periodic fluctuation in voltage<\/li><\/ul>\n\n\n\n<p><strong>Capture Transient Disturbances<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Dip (Sag) A momentary reduction in voltage<\/li><li>Swell A momentary increase of the voltage relative to nominal<\/li><li>Transient A very brief ( &lt;0.5 cycle) fluctuation in the voltage<\/li><\/ul>\n\n\n\n<p><strong>Return to remove the power monitoring equipment<\/strong><\/p>\n\n\n\n<p><strong>Report and Analyse<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Provide a detailed report of findings<\/li><li>Provide raw data to be kept as baseline<\/li><li>Make recommendations to improve power quality of necessary<\/li><\/ul>\n\n\n\n<p><strong>Deliverables<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Power Quality Analysis Report<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Power Quality Analysis Services Power Quality Arc Flash Advisors Ltd provides Power Quality Analysis Studies based on IEEE Std 519-1992 Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems.References:IEEE Std 519-1992CAN\/CSA C235CAN\/CSA E 1000 2-2-97 Power Quality Study process: Using a Fluke 434 Power Quality Analyzer Arc Flash Advisor Crews will: Visit the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"nf_dc_page":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-96","page","type-page","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/arcflashadvisors.com\/index.php?rest_route=\/wp\/v2\/pages\/96","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arcflashadvisors.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/arcflashadvisors.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/arcflashadvisors.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/arcflashadvisors.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96"}],"version-history":[{"count":1,"href":"https:\/\/arcflashadvisors.com\/index.php?rest_route=\/wp\/v2\/pages\/96\/revisions"}],"predecessor-version":[{"id":98,"href":"https:\/\/arcflashadvisors.com\/index.php?rest_route=\/wp\/v2\/pages\/96\/revisions\/98"}],"wp:attachment":[{"href":"https:\/\/arcflashadvisors.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}